Skip to main content (Press Enter).
Sign in
Skip auxiliary navigation (Press Enter).
workiva.com
Subscribe to Newsletter
Register
Skip main navigation (Press Enter).
Toggle navigation
Home
About
About AuditNet
About Jim Kaplan
Contact Us
Events
Upcoming Events
Resources
Audit Templates
Sustainability Audit Center
Audit News
External Audit Resources
Newsletter
Blog
Audit Templates (Standalone)
Community Navigator
View Only
Community Home
Library
1.7K
Back to Library
Repair Maintenance
Recommend
04-04-2015 09:57 AM
AuditNet Community Manager
Check that the preventive maintenance schedules of plant & machinery and equipment have been made at regular intervals in respect of all the branches of engineering -> Mechanical /Electrical Instrumental / Electronics etc.
Ensure that the preventive maintenance schedule is approved in writing by the Head of Engineering.
Ensure that preventive maintenance schedule is carried out as per the plan. Comment on the back log, if any.
Download the template for more steps
Statistics
0 Favorited
1 Views
1 Files
0 Shares
5 Downloads
Attachment(s)
201504RepairMaintenance.xlsx
64 KB
1 version
Uploaded - 09-08-2023
Download
Download Document
Please accept the terms of the copyright associated with this attachment before downloading it. Click the link below to read the terms.
Accept
Related Entries and Links
No Related Resource entered.
Copyright 2024. All rights reserved.
Powered by Higher Logic